Our company produces the thunder Mongolia
pulverizer is suitable for mohs' scale and so on the
barite, calcite, potash feldspar, talc, marble,
limestone, ceramics, glass is not bigger than 7
levels, the humidity in 6% profession 280 many kinds
of materials the and so on the below non- flammable
explosive mining industry, chemical industry,
building materials, metallurgy system powder
processings, the end product granularity adjusts
wilfully in 100 - 425 item scopes.
Lei Mengmo work process:
The R pulverizer entire machine structure is by
the main engine, the analyzer, the hose assembly,
the air blower, needs according to the user to be
possible to provide the breaker, the elevator, the
electromagnetism vibration for the material machine,
the electrically controlled electrical machinery and
so on composes. The material after crushes after
needs the granularity, delivers by the elevator the
material to the storage bin, again passes throughThe
vibration gives the material machineWill expect
uniform continuity sends in Lei Mengmo the main
engine to rub in the room, because will revolve time
the centrifugal force role, will rub the roller to
swing to outside, squeezes Yu Mohuan, the shovel
shovel plays the material to deliver rubs the roller
with to rub between the link, because will rub the
roller to roll but achieves the smashing goal. The
material grinds after the fine dust to lead along
with the air blower circulation wind the analyzer to
carry on the minute to elect, the degree of fineness
excessively thick material falls the grind, the
qualified fine dust then enters the end product
tornado collection dusting equipment along with the
air current, after leaves the powder tube to
discharge, is the end product. Rubs the room
internal cause grinding charge in Lei Mengmo to
foresee accurately has the certain moisture content,
grinds when the heat generation, the moisture
evaporates, as well as the entire machine various
pipelines connection is not strict, the outside gas
by the inspiration, makes the circulation barometric
pressure to advance, guaranteeGrinding machineWorks
under the negative pressure condition, increases the
gas current capacity disperses into the dust remover
through -odd air hose, after is purified disperses
into the atmosphere.
Thunder Mongolia closing a grave machine
structure characteristic:
1st, spatial structure, area small, the complete
set is strong, sub- independently from becomes a
production system from the brick to the end product
powder. 2nd, end product powder sub- degree of
fineness is even, passes sieving rate 99%, this is
other pulverizing equipment has with difficulty.
3rd, the engine drive installment uses the airtight
gear box and the band pulley, the transmission
steady, the movement is reliable. 4th, the important
part uses the high quality steel products,
wear-resisting uses the high performance
anti-friction material, entire machine
wear-resisting performance high, the movement is
reliable. 5th, the electrical system uses the common
control, the pulverizing workshop is basic may
realize nobody work, and service aspect.
Lei Mengmo uses maintenance and maintenance:
1st, the pulverizer in the middle of the use
process, should have the fixed personnel responsibly
to safeguard, the operator must have the certain
technical level. The pulverizer must carry on
essential technical training before the installment
to the operator, makes it to understand the
pulverizer the principle performance, familiar
working instruction. 2nd, for causes the grinding
machine to be normal, should formulate equipment
"equipment maintenance safe operation system" Fang
Neng to guarantee the grinding machine long-term
safe operation, at the same time must have the
necessity the service kit as well as the lubricant
and the corresponding fitting. After 3rd, the
grinding machine uses period of time, should carry
on the overhaul, at the same time to rubs the roller
to rub the link shovel and so on vulnerable to carry
on overhaul replacement processing, rubs the roller
installment to be supposed to carry on the careful
inspection around the use to the connecting bolt
nut, looked whether has the loose phenomenon,
whether the lubricating grease does replenish. 4th,
Lei Mengmo rubs the roller installment period of
revolution to surpass when about 500 hours
rereplaces rubs the roller, to roller set of in
respectively the rolling bearing must carry on the
clean, should promptly replace to the damage, the
greaser may use the manual gasoline-feed pump and
the yellow oil gun.

Lei Mengmo specification and
performance parameter:
|
Model |
3R2115 |
3R2615 |
3R2715 |
3R3016 |
4R3216 |
|
Rubs
Roller |
Integer |
3 |
3 |
3 |
3 |
4 |
|
Diameter(mm) |
210 |
260 |
270 |
300 |
320 |
|
Altitude(mm) |
150 |
150 |
140 |
160 |
160 |
|
Rubs
Link |
Inside diameter(mm) |
630 |
780 |
830 |
880 |
970 |
|
Altitude(mm) |
150 |
150 |
140 |
160 |
160 |
|
Biggest feeding granularity(mm) |
15 |
15-20 |
15-20 |
15-20 |
20-25 |
|
End product granularity(mm) |
0.044-0.165 |
0.044-0.165 |
0.044-0.165 |
0.044-0.165 |
0.044-0.165 |
|
Main engine power(KW) |
15 |
18.5 |
22 |
30 |
37 |
|
Becomes
Thin
(mm) |
0.125 |
Produces
Quantity
(t/h) |
1.2-1.8 |
1.8-2.5 |
2.3-2.8 |
0.6-1.2 |
3.2-4.5 |
|
0.075 |
0.6-1.2 |
1.2-1.8 |
1.8-2.3 |
1.9-2.6 |
2.4-3.1 |
|
0.044 |
0.6-1.0 |
0.8-1.2 |
0.9-1.7 |
1-1.9 |
1.8-2.5 |
|